-
Danilo Krummrich authored
If a sched job depends on a dma-fence from a job from the same GPU scheduler instance, but a different scheduler entity, the GPU scheduler does only wait for the particular job to be scheduled, rather than for the job to fully complete. This is due to the GPU scheduler assuming that there is a scheduler instance per ring. However, the current implementation, in order to avoid arbitrary amounts of kthreads, has a single scheduler instance while scheduler entities represent rings. As a workaround, set the DRM_SCHED_FENCE_DONT_PIPELINE for all out-fences in order to force the scheduler to wait for full job completion for dependent jobs from different entities and same scheduler instance. There is some work in progress [1] to address the issues of firmware schedulers; once it is in-tree the scheduler topology in Nouveau should be re-worked accordingly. [1] https://lore.kernel.org/dri-devel/20230801205103.627779-1-matthew.brost@intel.com/Signed-off-by: Danilo Krummrich <dakr@redhat.com> Reviewed-by: Faith Ekstrand <faith.ekstrand@collaboralcom> Link: https://patchwork.freedesktop.org/patch/msgid/20230811010632.2473-1-dakr@redhat.com
6cdcc65f