-
Frederic Weisbecker authored
When a task gets scheduled in. We don't touch the cpu bound events so the priority order becomes: cpu pinned, cpu flexible, task pinned, task flexible. So schedule out cpu flexibles when a new task context gets in and correctly order the groups to schedule in: task pinned, cpu flexible, task flexible. Cpu pinned groups don't need to be touched at this time. Signed-off-by: Frederic Weisbecker <fweisbec@gmail.com> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Paul Mackerras <paulus@samba.org> Cc: Ingo Molnar <mingo@elte.hu> Cc: Arnaldo Carvalho de Melo <acme@infradead.org>
329c0e01