sched_ext: Enable scx_ops_init_task() separately
scx_ops_init_task() and the follow-up scx_ops_enable_task() in the fork path
were gated by scx_enabled() test and thus __scx_ops_enabled had to be turned
on before the first scx_ops_init_task() loop in scx_ops_enable(). However,
if an external entity causes sched_class switch before the loop is complete,
tasks which are not initialized could be switched to SCX.
The following can be reproduced by running a program which keeps toggling a
process between SCHED_OTHER and SCHED_EXT using sched_setscheduler(2).
sched_ext: Invalid task state transition 0 -> 3 for fish[1623]
WARNING: CPU: 1 PID: 1650 at kernel/sched/ext.c:3392 scx_ops_enable_task+0x1a1/0x200
...
Sched_ext: simple (enabling)
RIP: 0010:scx_ops_enable_task+0x1a1/0x200
...
switching_to_scx+0x13/0xa0
__sched_setscheduler+0x850/0xa50
do_sched_setscheduler+0x104/0x1c0
__x64_sys_sched_setscheduler+0x18/0x30
do_syscall_64+0x7b/0x140
entry_SYSCALL_64_after_hwframe+0x76/0x7e
Fix it by gating scx_ops_init_task() separately using
scx_ops_init_task_enabled. __scx_ops_enabled is now set after all tasks are
finished with scx_ops_init_task().
Signed-off-by: Tejun Heo <tj@kernel.org>
Showing
Please register or sign in to comment