1. 12 May, 2023 1 commit
  2. 11 May, 2023 1 commit
  3. 10 May, 2023 2 commits
  4. 09 May, 2023 1 commit
  5. 05 May, 2023 2 commits
  6. 02 May, 2023 1 commit
  7. 26 Apr, 2023 2 commits
  8. 20 Apr, 2023 2 commits
  9. 19 Apr, 2023 5 commits
    • Thomas Gambier's avatar
      Release version typeB_V4.5 · e584d3ac
      Thomas Gambier authored
      The stackup is properly done for Megtron 6. Include all improvements
      from typeA_v4.5.
      e584d3ac
    • Thomas Gambier's avatar
      Add typeA_v4.5 in CHANGES.md · b922732f
      Thomas Gambier authored
      b922732f
    • Yuanxiang PAN's avatar
      Version typeA_v4.5 · f5dbf900
      Yuanxiang PAN authored
       * Fix Polygon location in power supply part, change the layer of certain power tracks
       * Fix Mosfet components info in BOM
       * Add HighIsolation rules to power input track
       * Rename board to typeA_v4.5
      
      This is mostly a cleanup release
      f5dbf900
    • Yuanxiang PAN's avatar
      Small fixes after version 4.4 · cd04747e
      Yuanxiang PAN authored
      Fix resistance value on B38, B39, B43:
       * R37 (BIAS of AD): move to 14k3 on 38, 39 and 43
       * R81y (VERY IMPORTANT: main voltage): move to 14k3 on 38, 39 and 43
       * R67y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R68y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R71y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R75y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R79y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R73z (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R84y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R104 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R105 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R109 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
       * R113 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43
      
      Add R140 to B28.
      
      Add R52x and R53x to B28 to pull down LNA TQL9093 shutdown pin.
      cd04747e
    • Thomas Gambier's avatar
  10. 31 Mar, 2023 1 commit
  11. 29 Mar, 2023 2 commits
  12. 20 Mar, 2023 4 commits
  13. 03 Mar, 2023 1 commit
  14. 02 Mar, 2023 4 commits
  15. 06 Feb, 2023 2 commits
    • Yuanxiang PAN's avatar
      Release version 4.3 · 265fcd23
      Yuanxiang PAN authored
      1. Suppress U7x,U7xb (old RF switch) totally on PCB.
      2. Split Pwr_1 Schematic into Pwr_1 and Pwr_2 to fit A4 format.
      3. Add C40x and C40xb to split Net between filter F3B38 and F4B4243.
      265fcd23
    • Thomas Gambier's avatar
      Add useful .gitignore · 27efc160
      Thomas Gambier authored
      27efc160
  16. 03 Feb, 2023 1 commit
  17. 25 Jan, 2023 2 commits
  18. 15 Dec, 2022 1 commit
  19. 12 Dec, 2022 1 commit
  20. 07 Dec, 2022 4 commits