-
Nikolay Borisov authored
Instead of iterating all pending tickets on the normal/priority list to sum their total size the cost can be amortized across ticket addition/ removal. This turns O(n) + O(m) (where n is the size of the normal list and m of the priority list) into O(1). This will mostly have effect in workloads that experience heavy flushing. Signed-off-by: Nikolay Borisov <nborisov@suse.com> Reviewed-by: David Sterba <dsterba@suse.com> Signed-off-by: David Sterba <dsterba@suse.com>
db161806