-
Yonglong Liu authored
When doing a loopback test at copper ports, the serdes loopback and the phy loopback will fail, because of the adjust link had not finished, and phy not ready. Adds sleep between adjust link and test process to fix it. Signed-off-by: Yonglong Liu <liuyonglong@huawei.com> Signed-off-by: David S. Miller <davem@davemloft.net>
2e1f1648