-
Luciano Coelho authored
Instead of using a hardcoded number of TUs before beacon 0 as the time to start the absence and actual channel switch, calculate it in relation to the beacon interval. We use 10 TUs + beacon interval before beacon 0 to target a bit before beacon 1. This gives us enough time to switch to the new channel before the AP/GO switches. Signed-off-by: Luciano Coelho <luciano.coelho@intel.com>
4500e133