-
Luciano Coelho authored
Instead of hardcoding the differences between UMAC scans and LMAC scans (which in this case is the number of simultaneous scans that can run), introduce a max_scans variable and stop scans of the other type (i.e. stop sched scan if regular scan is being attempted and vice-versa) if the number of running scans reached the maximum. Add a function that checks if the maximum number of scans was reached and stops the appropriate scan to make room for the new scan. Signed-off-by: Luciano Coelho <luciano.coelho@intel.com> Reviewed-by: Johannes Berg <johannes.berg@intel.com> Signed-off-by: Emmanuel Grumbach <emmanuel.grumbach@intel.com>
507e4cda