-
Jesse Barnes authored
We should disable the panel first when shutting down an eDP link. And when turning one on, the panel needs to be enabled before link training or eDP I/O won't be enabled. Signed-off-by: Jesse Barnes <jbarnes@virtuousgeek.org>
7643a7fa