-
Xin Long authored
These is no need to wait for 'interval' period for the next probe if the last probe is already acked in search state. The 'interval' period waiting should be only for probe failure timeout and the current pmtu check when it's in search complete state. This change will shorten the probe time a lot in search state, and also fix the document accordingly. Signed-off-by: Xin Long <lucien.xin@gmail.com> Signed-off-by: David S. Miller <davem@davemloft.net>
fea1d5b1