Bluetooth: Handle physical link completion
Several different actions may be taken when an AMP physical link becomes available. A channel being created on an AMP controller must continue the connection process. A channel being moved needs to either send a move request or a move response. A failed physical link will revert to using a BR/EDR controller if possible. Signed-off-by: Mat Martineau <mathewm@codeaurora.org> Acked-by: Marcel Holtmann <marcel@holtmann.org> Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com> Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Showing
Please register or sign in to comment