sched/rt: Reduce rq lock contention by eliminating locking of non-feasible target
commit 80e3d87b upstream. This patch adds checks that prevens futile attempts to move rt tasks to a CPU with active tasks of equal or higher priority. This reduces run queue lock contention and improves the performance of a well known OLTP benchmark by 0.7%. Signed-off-by: Tim Chen <tim.c.chen@linux.intel.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Shawn Bohrer <sbohrer@rgmadvisors.com> Cc: Suruchi Kadu <suruchi.a.kadu@intel.com> Cc: Doug Nelson<doug.nelson@intel.com> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Link: http://lkml.kernel.org/r/1421430374.2399.27.camel@schen9-desk2.jf.intel.comSigned-off-by: Ingo Molnar <mingo@kernel.org> [bwh: Backported to 3.2: adjust filename] Signed-off-by: Ben Hutchings <ben@decadent.org.uk>
Showing
Please register or sign in to comment