• Sebastien Robin's avatar
    mrp: enable possibility to define Transformed Resource Lines with industrial phases · dc676210
    Sebastien Robin authored
    As part of a manufacturing, we can have products partially built (thus having a particular
    industrial phase). However current code prevent setting as part of transformation lines a
    resource associated to a particular industrial phase. There should be no reaons to avoid this.
    
    industiral_phase is added to amount to allow getGeneratedAmountList (which is using
    temp Amount documents) to handle correctly industrial_phase
    dc676210
TransformedResource.py 6.85 KB