@@ -76,6 +76,7 @@ Are there any other stages or teams involved that need to be kept in the loop?
- [ ] Verify behaviour (See Beta Groups) and add details with screenshots as a comment on this issue
- [ ] If it is possible to perform an incremental rollout, this should be preferred. Proposed increments are: `10%`, `50%`, `100%`. Proposed minimum time between increments is 15 minutes.
- When setting percentages, make sure that the feature works correctly between feature checks. See https://gitlab.com/gitlab-org/gitlab/-/issues/327117 for more information
- For actor-based rollout: `/chatops run feature set feature_name 10 --actors`
- For time-based rollout: `/chatops run feature set feature_name 10`