-
Uma Krishnan authored
AFU sync operations are not currently evaluated for failure. This is acceptable for paths where there is not a dependency on the AFU being consistent with the host. Examples include link reset events and LUN cleanup operations. On paths where there is a dependency, such as a LUN open, a sync failure should be acted upon. In the event of AFU sync failures, either log or cleanup as appropriate for operations that are dependent on a successful sync completion. Update documentation to reflect behavior in the event of an AFU sync failure. Signed-off-by: Uma Krishnan <ukrishn@linux.vnet.ibm.com> Acked-by: Matthew R. Ochs <mrochs@linux.vnet.ibm.com> Signed-off-by: Martin K. Petersen <martin.petersen@oracle.com>
c2c292f4