IB/cm: Update protocol to support XRC
Update the REQ and REP messages to support XRC connection setup according to the XRC Annex. Several existing fields must be set to 0 or 1 when connecting XRC QPs, and a reserved field is changed to an extended transport type. Signed-off-by: Sean Hefty <sean.hefty@intel.com> Signed-off-by: Roland Dreier <roland@purestorage.com>
Showing
Please register or sign in to comment