- 13 Jun, 2024 2 commits
-
-
Yuanxiang PAN authored
-
Yuanxiang PAN authored
Update Silkscreen on OrsTypeC to TypeC_V4.6
-
- 17 May, 2024 3 commits
-
-
Yuanxiang PAN authored
VCXO RTV-2520BF33P-S-38.400-TR RF Filter TAISAW TA2892AA0031
-
Yuanxiang PAN authored
-
Yuanxiang PAN authored
-
- 12 May, 2023 1 commit
-
-
Jean-Marc Ouvrard authored
-
- 11 May, 2023 1 commit
-
-
Thomas Gambier authored
-
- 10 May, 2023 2 commits
-
-
Thomas Gambier authored
-
Jean-Marc Ouvrard authored
-
- 09 May, 2023 1 commit
-
-
Jean-Marc Ouvrard authored
-
- 05 May, 2023 2 commits
-
-
Yuanxiang PAN authored
-
Yuanxiang PAN authored
* 3 variations : B39, B40, B41
-
- 02 May, 2023 1 commit
-
-
Yuanxiang PAN authored
* Modify position of polygon on Layer6; * Modify Top Solder under filters
-
- 26 Apr, 2023 2 commits
-
-
Jean-Marc Ouvrard authored
-
Thomas Gambier authored
-
- 20 Apr, 2023 2 commits
-
-
Thomas Gambier authored
-
Thomas Gambier authored
-
- 19 Apr, 2023 5 commits
-
-
Thomas Gambier authored
The stackup is properly done for Megtron 6. Include all improvements from typeA_v4.5.
-
Thomas Gambier authored
-
Yuanxiang PAN authored
* Fix Polygon location in power supply part, change the layer of certain power tracks * Fix Mosfet components info in BOM * Add HighIsolation rules to power input track * Rename board to typeA_v4.5 This is mostly a cleanup release
-
Yuanxiang PAN authored
Fix resistance value on B38, B39, B43: * R37 (BIAS of AD): move to 14k3 on 38, 39 and 43 * R81y (VERY IMPORTANT: main voltage): move to 14k3 on 38, 39 and 43 * R67y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R68y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R71y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R75y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R79y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R73z (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R84y (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R104 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R105 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R109 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 * R113 (VERY IMPORTANT: main voltage): move to 22k on 38, 39 and 43 Add R140 to B28. Add R52x and R53x to B28 to pull down LNA TQL9093 shutdown pin.
-
Thomas Gambier authored
-
- 31 Mar, 2023 1 commit
-
-
Thomas Gambier authored
They are now located at https://lab.nexedi.com/nexedi/altium-lib
-
- 29 Mar, 2023 2 commits
-
-
Thomas Gambier authored
-
Thomas Gambier authored
-
- 20 Mar, 2023 4 commits
-
-
Jean-Marc Ouvrard authored
-
Jean-Marc Ouvrard authored
-
Yuanxiang PAN authored
Regenerate ALL output files.
-
Thomas Gambier authored
-
- 03 Mar, 2023 1 commit
-
-
Yuanxiang PAN authored
-
- 02 Mar, 2023 4 commits
-
-
Yuanxiang PAN authored
Add 2 more variations : FDDB28 for band 28, DEVBOARD for test purpose. Variation DEVBOARD has no PA, we have a MCX connector for TX just after the pre ampli, and a MCX connector for RX before the preampli. Variation FDDB28 is for band 28 in FDD, this variation has no duplexer on the PCB but has a MCX connector after the PA for TX and a MCX connector for RX. The duplexer will be added outside the PCB.
-
Yuanxiang PAN authored
-
Jean-Marc Ouvrard authored
-
Thomas Gambier authored
-
- 06 Feb, 2023 2 commits
-
-
Yuanxiang PAN authored
1. Suppress U7x,U7xb (old RF switch) totally on PCB. 2. Split Pwr_1 Schematic into Pwr_1 and Pwr_2 to fit A4 format. 3. Add C40x and C40xb to split Net between filter F3B38 and F4B4243.
-
Thomas Gambier authored
-
- 03 Feb, 2023 1 commit
-
-
Thomas Gambier authored
-
- 25 Jan, 2023 2 commits
-
-
Jean-Marc Ouvrard authored
-
Jean-Marc Ouvrard authored
-
- 15 Dec, 2022 1 commit
-
-
Jean-Marc Ouvrard authored
Improve Gerber files and BOM.
-